Aiming for LEED Silver Status

Current construction photo of the project – closing in on roof panel installation.

Petersen’s Acworth, GA factory began working on this project almost two years ago with roofing contractor, Hamlin Roofing of Garner, NC. Panel shipment for this job is anticipated in the next month, moving towards a projected occupancy of the building in January, 2012. The project is aiming for LEED Silver Status, with PAC products contributing towards points in the Materials and Resources category for incorporation of materials containing recycled content. Copper is 100% recyclable to reduce future landfill waste, and is also produced from 90 – 95% recycled copper. The Dental Sciences Building is the latest UNC effort to support the university’s sustainability initiatives. Check back to see the progression of this magnificent project from panel production through installation and completion.

Leave a Reply

You must be logged in to post a comment.

Snap-Clad Panel
Tite-Loc Panel
Tite-Loc Plus Panel
Tite-Loc HS Panel
Snap-On Standing Seam Panel
High Snap-On Standing Seam Panel
Snap-On Batten Panel
Redi-Roof Standing Seam Panel
Redi-Roof Batten Panel
ColorGard® Snow Retention System
PAC-150 90° Single Lock
PAC-150 180° Double Lock
M-42 & M-36 Panels
7.2 Panel
1/2″ & 7/8″ Corrugated Panel
R-41 & R-36 Panels
Coil and Flat Sheet
Flashing and Trim
Custom Fabrication
Anodized Aluminum
Copper & Stainless Steel
PAC-750 Soffit
PAC-850 Soffit
Flush/Reveal Soffit
PAC-1000F Column Cover
PAC-1000C Column Cover
PAC-1000R Column Cover
PAC-2000F Column Cover
PAC-2000C Column Cover
PAC-2000R Column Cover
PAC SS Vented Eave & Intake Vent
PAC ECO Vented Fascia
PAC SS Rake Panel & Fascia
PAC SS Ridge Vents
PAC-TITE Angular Fascia
PAC-TITE WT Canted Fascia
PAC-TITE WT Extended Fascia
PAC-LOC Fascia
PAC Snap Edge Fascia
PAC Extended Snap Edge Fascia
PAC-TITE Gold Coping
PAC-Continuous Cleat Coping
Precision Series Wall Panels
Composite Wall Panels
Flush/Reveal Wall Panels