
PAC-CLAD HT from Petersen is a self-adhering, high-temperature roofing underlayment designed to provide premium waterproofing protection for a variety of roofing applications. PAC-CLAD HT underlayment offers protection against water and ice damming while withstanding extreme weather conditions. The self-adhering qualities of PAC-CLAD HT reduces labor costs and installation times while providing increased protection compared to that of typical felt roofing underlayments. This strong, skid-resistant high-tensile-strength rubberized asphalt membrane is available in either black or white.
STORAGE
PAC-CLAD HT rolls should be stored on their side, under cover and in areas where the temperature is between 40° and 100°F (4.4° and 38°C). Do not double-stack pallets. Exposure to sunlight should not exceed 60 days for black and 180 days for white.
WARRANTY
PAC-CLAD HT is backed by an industry-leading warranty and will deliver optimal performance when stored under recommended conditions and used within one year of date of manufacture. Product installed after one year of date of manufacture is not covered under defect warranty.
PRIMING
Priming is not required on clean, dry wood, metal or most polyisocyanurate surfaces (polyiso paper facer does require priming). Masonry and exterior gypsum boards (such as DensDeck®) should be primed using an appropriate primer or adhesive. Some rigid insulation boards with porous or dusty surfaces may require priming to promote initial adhesion. Priming is required on all substrates when air or substrate temperatures are below 40°F (4.4°C). Adhesives such as CCW-702, CCW-702WB, CAV-GRIP™ and CCW-AWP are approved for use with PAC-CLAD HT. Refer to your local building codes to determine acceptable product for use in your region. Selection of roof deck or insulation substrate and/or use of a primer or adhesive are the responsibility of the architect, specifier or roofing contractor to determine based on the roof assembly and environmental conditions.
INSTALLATION
PAC-CLAD HT underlayment is applied when the roof deck is dry and the substrate temperature is 40°F (4.4°C) or higher. At temperatures below 40°F, nailing or priming should be used to temporarily hold the membrane in place while adhesion develops. PAC-CLAD HT is designed to be covered with the primary roofing system and should not be exposed to sunlight for more than 60 days (black film only). White underlayment offers exposure time of 180 days. Substrate must be free of any moisture. If moisture is present, it may inhibit adhesion. Prepare the roof deck by removing all loose objects, dirt, dust and debris. For re-roofing applications, remove all old materials from the roof deck in the area to be covered with PAC-CLAD HT underlayment. Replace water-damaged sheathing and sweep roof deck thoroughly.
LIMITATIONS
We don't have any example projects using PAC-CLAD HT yet. You can click the button below to view all our example projects.
Does your project use PAC-CLAD HT? Submit our Publicize Your Project form to see if it can be included in our project gallery.
Need answers or eager to launch a new project? Complete the form below and one of our expert team will respond promptly.
Search the entire site by keyword or use one of the advanced search options.